Go to content Go to search
Free tickets to Grand Designs Live London Excel, 4 to 12 May 2024 London Excel, 4 to 12 May 2024

Can Quick-Step Laminate be installed on top of an existing floor?

Yes, this is possible. The exact installation method depends on which floor you want to install your laminate.

On a damp-porous floor covering

First remove any damp-porous floor covering (i.e. carpet, needle felt, etc.) before installing the Quick-Step Laminate. 

On a damp-sealer floor covering

Damp-sealed floor covering (PV, linoleum, VCT, etc.) doesn't have to be removed but a Quick-Step levelling underlay should be installed. 

On a wooden subfloor

When you have a wooden subfloor, you have to remove every existing floor covering first.

Important:

  • No signs of mould and/or insect infestations should be present.
  • Make sure the subfloor is level. Any unevenness greater than 4 mm over the length of 2 meter must be smoothed out. The same applies to any unevenness of more than 1 mm over a length of 20 cm. This rule does not cope to national regulations about levelling.
  • Nail down any loose parts.

When you have an uneven timber floor, you must install the Quick-Step underlay Thermolevel. Also, there must be sufficient ventilation in the crawl space underneath the timber floor. The moisture content of the wood must not exceed 10%. Install the new floor at ninety degrees to the existing subfloor.

For more detailed instructions, contact our technical services department.

Learn more:

Was this article helpful?
How can we improve this article?

Thank you for your feedback!

Oops. Something went wrong.

An unknown error has occurred. Please try again. If the issue continues, please get in touch.